INTRODUCTION OF CARRIAGE & WAGON

ROLE OF C &W IN INDIAN RAILWAYS

IMAGE FROM GOOGLE
  1. RELATED WITH OPEN LINE WORKING
    – TO ENSURE AND TO AND CO-OPRETE IN SAFER RUNING OF ROLLING STOCK
    -TO ATTEND REQUIRED SCHEDULE MAINTENANCE AND RUNING REPAIRS OF ROLLING STOCK ARE AGAIN DUE FOR POH
    -TO ASSIST IN TIME RUNING OF TRAINS TO MAINTAIN THE PUNCTUALITY
  2. RELATED WITH WORK-SHOP WORKING
    -TO ATTEND PREIODICAL OVERHAULING OF ROLLING STOCKS
    -TO ADOPT REQUIRED MODIFICATIONS
    -TO MAINTAIN PROPER RECORDS OF ALL THE ROLLING STOCK RUNING IN INDIAN RAILWAY

    FOR MORE INFORMATION ABOUT CARRIAGE AND WAGON PELESE DOWNLOAD FOLOWING NOTES –

    DISCLAMER- THE INFORMATION/NEWS/VIDEO/PORVIDED IN THIS PLATFORM HAS BEEN   COLLECTED FORM DIFFERENT SOURCES .WE BELIEVE THAT KNOWLEDGE IS POWER AND OUR AIM IS TO CREATE GENERAL AWARENESS AMONG PEOPLE AND MAKE THEM POWERFUL THROUGH EASILY ACCESSIBLE INFORMATION/NEWS/VIDEOS/PDFS.

    IF YOU LIKE THIS INFORMATION PELESE SUBSCRIBE US ON YOU TUBE AND INSTAGRAM
    https://youtube.com/user/MrBantu1988